Plantas S.A.
Production and trade of seedlings
Installation of 3 LPG tanks and Vaporizers
Fabrication and installation of TIG welded carbon steel liquid and gas LPG piping with Seamless Steel Piping according to API 5L (A106) GR.B ANSI B36.10 SCH40, and SW carbon steel forged fittings according to ANSI / ASME B16.11, ASTM A-105, 3000 lb.
Liquid (Fluorescent) Penetrant Inspection of all welds, Third Party Inspection (TPI) – Hydraulic testing and certification.
Details
LOCATION
Thiva, Greece
DATE
January 2016 & May 2017
PROJECT CATEGORY
Food